36 Glenview

Defective Blocks Rebuilds 36 Glenview This dwelling was fully demolished and rebuilt under the Irish Defective Concrete Block scheme, with the homeowners opting for a modern timber frame construction to accelerate the build programme. By choosing timber frame, the structure was erected and made weather-tight—with the roof fitted—within just three months, clearly demonstrating the speed […]
Lisnakelly

Defective Blocks Rebuilds Lisnaskelly This story-and-a-half home was fully demolished and rebuilt under the Defective Concrete Block scheme, with targeted modifications made to the roof structure and internal floor layout to better suit the homeowners’ specific requirements. These design adjustments allowed the rebuilt home to maximise space, functionality, and long-term livability while remaining fully compliant […]
Carolina, Buncrana

Defective Block Rebuilds Carolina This straightforward bungalow marked our first home completed under the Irish Defective Concrete Block (DCB) scheme. The existing dwelling was fully demolished and rebuilt in line with scheme requirements and current Irish building regulations, with the completed home handed back to the homeowner within nine months of commencement. The homeowner chose […]
Lisfannon Heights

Defective Blocks Rebuilds Lisfannon Heights This story-and-a-half home in Lisfannon Heights, overlooking Lough Swilly, was fully demolished and rebuilt under the Defective Concrete Block scheme, retaining the original footprint. By rebuilding on a like-for-like basis, no new planning permission was required, allowing the project to progress efficiently while remaining fully compliant with grant conditions and […]
1 & 2 Doonwood, Buncrana

Defective Blocks Rebuilds 1 & 2 Doonwood, Buncrana These semi-detached homes were demolished and rebuilt as a single project under the Defective Concrete Block scheme, allowing both homeowners to significantly reduce overall costs by sharing demolition, groundwork, and construction stages. Rebuilding together not only streamlined the process but resulted in substantial savings for both parties […]